Documents & checklists

The paper trail that keeps inspections, draws and warranty claims moving. Print any phase checklist below for the field clipboard.

Supporting document library

Pre-construction file

  • Title commitment, deed and recorded plat
  • Zoning verification letter and HOA approval
  • Boundary and topographic survey (stamped)
  • Geotechnical / soils report
  • Architectural plan set and structural calculations (sealed)
  • Energy compliance report and certificate
  • Site, grading and drainage plan
  • Signed contract, scope of work and allowance schedule

Permits & municipal approvals

  • Building permit card (posted on site)
  • Plumbing, electrical and mechanical trade permits
  • Water / sewer tap permit, septic or well permit
  • Driveway / right-of-way cut permit
  • SWPPP / erosion control permit and posted notice
  • Temporary power release
  • Certificate of Occupancy

Inspection & test records

  • Soil compaction / density test reports
  • Underground plumbing and gas pressure test results
  • Concrete mix designs, delivery tickets and cylinder breaks
  • Post-tension tendon stressing log (if applicable)
  • Rebar, framing, shear and insulation inspection sign-offs
  • Blower-door and duct-leakage test reports
  • Shower pan flood test photos with date
  • HVAC start-up and airflow balance report
  • Final trade inspection cards

Trade & vendor paperwork

  • Subcontractor agreements, insurance certificates and W-9s
  • Truss engineering drawings (kept on site)
  • Approved shop drawings: cabinets, countertops, stairs
  • Material submittals and manufacturer installation instructions
  • Lien waivers with each payment application
  • Change order log with signed approvals

Homeowner handover binder

  • Certificate of Occupancy and all permit finals
  • Appliance and equipment manuals with model / serial numbers
  • Warranty documents: workmanship, systems, structural
  • Paint, tile and finish schedule with colors and sheens
  • Filter sizes and maintenance schedule
  • Shutoff location map: water, gas, electrical panel
  • Punch list sign-off and orientation walk video

Printable phase checklists