Jobsite tracker
Create a jobsite for each active project. Each keeps its own checklist progress on this device.
Zoning & Lot Due DiligenceBuilder / Super · Survey & Engineering
- Title / easements reviewed
- Setback envelope drawn on plat
- Flood zone determination pulled
- Utility availability confirmed in writing
- HOA submittal package sent
Geotechnical Report & Boundary SurveySurvey & Engineering
- Borings complete
- Geotech report received and forwarded to engineer
- Boundary + topo survey stamped
- Corner pins flagged and protected
Construction Documents & EngineeringBuilder / Super · Survey & Engineering
- Architectural set complete
- Structural stamped
- Energy compliance done
- Trades reviewed plans
- Plan set printed for field
Permit Submittal, Review & IssuanceBuilder / Super · Inspections
- Permit issued and card posted
- Trade permits pulled
- SWPPP installed and inspected
- Temp power and temp water set
- Portable toilet and dumpster on site
Clearing, Erosion Control & Building StakeoutEarthwork · Survey & Engineering
- 811 locates marked
- Silt fence and inlet protection in
- Rock construction entrance built
- Topsoil stockpiled
- Offset stakes and benchmark set
Excavation, Pad Build & CompactionEarthwork
- Cut / fill to subgrade
- Lifts compacted and tested
- Density report filed
- Pad drains away from house
Underground Plumbing & Utility SleevesPlumbing · Electrical · Earthwork
- DWV installed to slope
- Test held and inspected
- Water service and sleeves placed
- Penetrations photographed and dimensioned
Footings, Forms & Rebar InspectionConcrete
- Forms set to line and elevation
- Diagonals verified square
- Steel chaired, lapped, and tied
- Rebar inspection passed
Vapor Barrier, Slab Pour & WaterproofingConcrete
- Vapor barrier sealed
- Pre-pour inspection passed
- Slab poured and finished flat
- Cure protected 7 days
- Waterproofing and drain installed
- Backfill compacted in lifts
Sill Plates, Wall Framing & LayoutFraming
- Sill sealer and PT plates set
- Walls framed, plumb, and straight
- Headers per plan
- Rough openings verified against door / window schedule
- Blocking and backing installed and photographed
Shear Walls, Straps & Hold-downsFraming · Inspections
- Sheathing nailing verified
- Hold-downs installed and torqued
- Straps fully nailed
- Shear inspection passed
Floor System, Roof Trusses & SheathingFraming · Roofing
- Floor system set, glued, screwed
- Trusses set and braced per drawings
- Roof sheathed and clipped
- Truss drawings on site
Roof Dry-in, Windows & Exterior DoorsRoofing · Framing
- Roof dried in
- WRB installed shingle-lapped
- Windows set plumb, level, flashed
- Exterior doors set and pan-flashed
- Kickouts installed
Plumbing Rough-inPlumbing
- DWV and vents complete
- Water lines run and manifolded
- Tub / shower pans set and protected
- Nail plates installed
- Test held, inspection passed
HVAC Ductwork & Equipment RoughHVAC
- Manual J / D / S on file
- Trunks and branches installed and supported
- Boots sealed with mastic
- Return paths for all rooms
- Line sets and flues installed
- Rough inspection passed
Electrical Rough-in & Home RunsElectrical
- Panel set and grounded
- Boxes set to depth and height
- Home runs pulled and labeled
- AFCI / GFCI circuits mapped
- Smoke / CO locations verified
- Rough inspection passed
Low Voltage, Security & Pre-wireLow Voltage
- Data / coax pulled and labeled
- Camera and doorbell runs in
- Speaker wire and backboxes set
- Head-end location powered
- Spare conduits installed
Pre-Drywall Multi-Trade Walk & Framing InspectionBuilder / Super · Inspections · Framing
- Fire blocking / draft stopping complete
- All trade rough inspections passed
- Framing inspection passed
- Wall bays photographed
- Homeowner pre-drywall walk done
Air Sealing, Insulation & Blower-Door PrepInsulation
- Top plates and rim joists sealed
- Penetrations fire-caulked
- Baffles installed
- Insulation to spec, Grade I
- Pre-drywall blower door run
- Insulation inspection passed
Drywall Hang, Tape, Texture & PrimeDrywall · Painting
- Board hung and screwed to pattern
- Fire-rated assemblies correct
- Taped and textured to spec level
- Primed
- Light-raked and touched up
Interior Doors, Trim & StairsFinish Carpentry
- Doors hung, reveals even, latching
- Casing and base installed
- Stair rise / run verified
- Handrails and guards to height
- Caulked and puttied for paint
Cabinets, Countertops & TileFinish Carpentry · Tile & Flooring
- Cabinets set, level, fastened to blocking
- Appliance openings verified
- Tops templated and installed
- Shower pan flood tested
- Tile set, lippage checked
- Flooring moisture tested and installed
Siding, Stucco or Masonry VeneerExterior Skin
- Lath / WRB inspected
- Cladding installed to spec
- Weeps and air space clear
- Clearances to grade verified
- Penetrations flashed and sealed
Flatwork, Grading, Gutters & DrainageFlatwork & Grading · Concrete
- Sub-base compacted
- Flatwork poured and jointed
- Final grade sloped away
- Gutters and extensions installed
- Drainage verified with a hose test
Plumbing Fixtures & Water Heater Start-upPlumbing
- Fixtures set and sealed
- Water heater installed and started
- PRV / expansion tank verified
- Appliance connections made
- Leak check documented
Electrical Trim, Devices & Panel LabelingElectrical
- Devices and plates installed
- Fixtures hung and lamped
- Terminals torqued
- GFCI / AFCI tested
- Panel directory typed
- Electrical final passed
HVAC Condensers, Grilles & CommissioningHVAC
- Condensers set and charged
- Grilles and registers installed
- Static pressure measured
- Airflow balanced
- Condensate protection verified
- Start-up report filed
Municipal Final Inspections & Certificate of OccupancyBuilder / Super · Inspections
- All trade finals passed
- Energy certificate posted
- Egress and guard dimensions verified
- Alarms tested
- Grading release obtained
- Certificate of Occupancy in hand
QA Punch List & Final CleanBuilder / Super
- Builder punch complete
- Trades returned and verified
- Second verification punch clean
- Final detail clean done
- House locked and keyed
Homeowner Orientation & Keys HandoverBuilder / Super
- Systems orientation completed
- Documents and warranties delivered
- Paint and finish schedule provided
- Utilities transferred
- Keys, remotes, and codes handed over
- Warranty visits scheduled